In short: The City of Whittlesea has strict planning policy for the township. A local building surveyor issues the occupancy permit only after the work meets the NCC and the approved drawings.
The building process
A new build must meet the National Construction Code. The approved drawings show how the house should be. The Building Act 1993 governs the whole project. A registered building surveyor oversees the compliance work.
Why stage inspections matter
The final inspection is called a PCI. You need a PCI to get an occupancy permit. The building surveyor can only issue that permit if the works are complete. Stage inspections catch issues before the final sign-off.
What stage inspections check
We check the frame, cladding, roof and waterproofing. We verify the site works match the drawings. We look for defects against the Guide to Standards and Tolerances. We ensure the safety of the structure.
The settlement risk
The area has varied soil. A slab on reactive clay can shift over time. The Guide to Standards and Tolerances allows for some movement. Excessive movement indicates a design or construction problem.
Written by our local inspection team from work carried out in Whittlesea. Licensed building practitioners.