Fixing stage inspection in Whittlesea

Joinery and mouldings installed, painter not started, wet area items due to be closed out.

  • After joinery and doors installed, before painting
  • 1 to 2 hours on site
  • Report within 24 hours
Get a quoteLeave your details here and we will send you a price

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage5 of 7
When to bookAfter joinery and doors installed, before painting
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Whittlesea fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Whittlesea builds

Fixes defects and ensures the PCI. We inspect the timber framing to make sure it meets the approved drawings. We verify that waterproofing works are complete before tiles are laid. We note damage to finished surfaces and roof sheeting from trades, as identification becomes difficult once coatings are applied.

What we find at this stage in Whittlesea

  • Open waterproofing items from the build stage
  • Roof cladding damage found
  • Door and joinery hardware not adjusted
  • Trades damage report
  • Sealants and joints need work
Screw covers, recorded during a fixing inspection in Beveridge
Screw covers are missing from the joinery. This leaves the screws exposed and creates a rough surface, Beveridge
Sample findings

Sample defects found during our fixing inspections in Whittlesea

Annotated findings from Fixing inspections.

Bowed, recorded during a fixing inspection in Beveridge
Bowed skirtings may indicate structural movement in the home, Beveridge
Screw caps, recorded during a fixing inspection in Beveridge
The inspector found the screws were not covered with cover buttons, Beveridge
Moulding joints not aligned / glued, recorded during a fixing inspection in Beveridge
Internal mouldings are not aligned and flush at joints, Beveridge
Caulking to wall/ floor/skirting joints, recorded during a fixing inspection in Beveridge
Caulking at floor and skirting joints is recommended to follow good building practice, Beveridge

The other stages of a Whittlesea build

  1. Bored piers inspection in Whittlesea1Bored piersAfter drilling and cage placement, before concrete
  2. Slab pre-pour inspection in Whittlesea2Slab pre-pourThe day before pouring, before waterproofing
  3. Frame inspection in Whittlesea3FrameAfter wall frame erection and bracing, before lining
  4. Lock-up (pre-plaster) inspection in Whittlesea4Lock-up (pre-plaster)After roof cladding and external doors, before plasterboard
  5. Waterproofing inspection in Whittlesea6WaterproofingAfter membrane application and prior to tiling
  6. Pre-handover (PCI) inspection in Whittlesea7Pre-handover (PCI)Two to three weeks prior to handover

All construction stage inspections in Whittlesea →

Guides

Construction stage guides for Whittlesea

All guides →

Book a fixing inspection in Whittlesea

Instant online pricing for Whittlesea, or contact the booking team.

FAQ

Fixing inspections in Whittlesea: common questions

Do you need a waterproofing inspection?

They share similar inspection times but check for different issues. Waterproofing protects the wet areas before tiling begins, while fixing involves the carpentry work and completing the build.

Are you painting before inspection?

Paint hides cracks, joins and damage a fixing inspection checks for. Painting often covers cracks and other defects, making them much harder to detect and prove.

Is the roof sheeting damage real?

Stage inspections usually happen during construction. You can inspect items easily while the lift or scaffolding is still up. Inspectors use aerial drones to check site conditions once the scaffolding is removed.

How long will the report take?

A standard inspection for an existing property usually takes a few hours, and the written report is usually available the same day or the next morning.

Is my selection correct?

We compare the work against the approved drawings and specifications to ensure they meet the standards set out in the Building Act 1993. Your decisions are your own inspection.

Do I need a final inspection before tiles are in place?

For most builds, this is the case. Fixing wet areas is the final chance to correct issues at a lower cost. The final inspection happens once the tiles are in place.

Get a Free Quote