Why new builds need a stage inspection
A new house is not finished until the council signs off. A stage inspection checks that the builder is following the plan.
Whittlesea 3757 · 29 June 2026
Fully licensed & accredited
-
Building & Plumbing Commission -
Australian Society of Building Consultants -
Strata Community Association -
Building Dispute Practitioners Society
In short: Building on your own land is a long process. A professional check at the right times stops problems before they become expensive.
A house is not a home yet
Getting the keys is not the same as getting a certificate. The final step is the PCI from a building surveyor.
Checking against the rules
Work is measured against the approved drawings, the engineering and the NCC. It is not just a visual check.
Why timing matters
Structural defects are easier to fix before the slab is poured. Waiting until the end can mean a partial rebuild.
Using the right standard
AS 4349.1 is for old homes. New builds are checked against the Guide to Standards and Tolerances.
What the report looks like
The report lists each issue against the tolerance. It explains why it is a problem for the owner.
Written by our local inspection team from work carried out in Whittlesea. Licensed building practitioners.